← Civic ideas

Possible / Civic idea / Research explorer 1.0 · October 23, 2026

The Productive
City.

Computing, homes and heat

Seattle has a surplus of office space and a shortage of homes. What else could our downtown buildings do?

More than a third of downtown office space is vacant. Cushman & Wakefield measured 35.8% vacancy in Q3 2026, up from 35.1% a year earlier. Its surveyed downtown market contained about 18.3 million square feet of vacant space, including direct and sublease vacancies. Read the Q3 report ↗

That is a substantial stock of existing space in a city that needs more homes. Seattle’s office-to-residential program already addresses those two problems together. But converting an office is expensive, and a cheaper building does not automatically make the work affordable.

For buildings that no longer work well as offices, waiting for the old demand to return is only one option. The Productive City asks whether homes, a computing tenant and useful recovered heat could together support another future. The test is whether the housing and public benefits justify the space, electricity and construction they require.

Try the downtown explorer ↓

01 / Place a possibility

One megawatt. Then another.

Start with a hypothetical 1 MW computing installation. Choose a real downtown building, specify a heat-demand scenario, and see what happens as more installations are added. Try smaller capacities, different numbers of homes or a sheltered outdoor seating area.

Hypothetical installations00 MW installed IT
Facility demand at full IT load0 MW0 GWh/year at chosen utilization
Heat actually used in scenarios0 MWh/yrDemand specified at 0 of 0 locations

Facility demand excludes other building loads and heat-pump/pump electricity. These scenarios add no confirmed homes or approved data centers.

Building-specific leasing evidence: 1 of 100 locations researched so far. The study set includes offices, homes, hotels and public buildings; their occupancy measures are not interchangeable.

Loading downtown map… The building list works below.

Choose what to test

FOURTH & BLANCHARD BUILDING

2101 4TH AVE

2024 reporting record · 24 reported floors · 427,155 gross sq ft · NonResidential. Names and map locations follow the source record; they are not a current survey.

Where does the recoverable heat go?

  • Used source heat: 0 MWh/yr
  • Rejected at locations with modeled demand: 0 MWh/yr
  • Demand not modeled: 0 MWh/yr

Modeled heat pumps add 0 MWh/year of electricity. Modeled users still require 0 MWh/year of backup heat. No heat sales, shared pipes or carbon savings are assumed.

Assumptions, source records and what the model leaves open

All installations use PUE 1.3, 80% recoverable IT heat and a heat-pump COP of 4. Residential scenarios assume 5,000 kWh/home/year including hot water and 2.5 kW/home peak. Twenty percent of annual demand forms a constant hot-water base; a synthetic winter triangle supplies the remainder. This is an hourly illustrative profile, not Seattle weather or a measured building load. No storage is modeled. Equipment outages still require independent backup heat and cooling.

Outdoor seating operates during six evening hours on approximately 250 synthetic cool days. Its heat is drawn from the same finite supply after residential use. Direct low-temperature reuse, piping losses and real temperatures require design. Outdoor comfort is a new amenity, not an automatic energy saving.

The study set is the first 100 single-building records, ordered by reported floors (at least 15), in a downtown bounding rectangle from the City’s 2024 disclosure. It is not a count of suitable buildings. Utility capacity, operator interest, structural fit, fiber, existing tenants and permitting are unknown.

Seattle building benchmarking source ↗

02 / The city is more than a sum

Useful heat. Real electrical demand.

At our default assumptions, 1 MW of installed computing could supply about 0.91 MW of heat after recovery and a heat pump. That comes close to the modeled winter peak for roughly 360 homes. Hot water is part of the annual demand; its simultaneous peak and temperature requirements still need design.

But a winter-sized heat source is too large for most summer days. In our illustrative residential profile, much of its annual heat still needs to be rejected. A nearby year-round customer could help, provided the connection, delivery temperatures and contracts work. A thermal network and a shared computing operator are separate choices.

Ten 1 MW installations imply about 13 MW of compute-facility demand at full load; fifty imply 65 MW. Heat pumps and other building loads add to that. Distributing computing does not make its cumulative demand disappear. City Light’s 10 MVA service policy is separate from the over-20-MVA land-use moratorium definition; neither provides a promise of available service.

A warmer place to sit.

Recovered heat might also serve sheltered outdoor seats or nearby radiant surfaces. Begin with wind and rain protection, then target occupied places. The explorer’s 20 kW seating zone is a modest experiment, not a reason to enlarge computing simply to use its heat. It receives only what remains after residential demand, and creates no assumed heat-sales income.

03 / First building investigation

Warm Tower, Fourth & Blanchard.

This prototype begins with a building whose future is already in question. Colliers’ public sale listing reports Fourth & Blanchard as 54% leased (checked October 23, 2026; the figure is undated). Its seven-building portfolio went through foreclosure on August 8, 2025. That combination of underused space and an ownership reset is one reason we chose it to test another future. Existing tenants and lease terms remain part of that test.

The original three-floor case mostly fails the thermal-synergy test: its apartments could absorb only about 3% of estimated annual recoverable heat, before timing constraints. Most of its modeled financial improvement comes from compute tenancy and changes in space and cost. A large financing gap remains.

The next version asks a sharper question: what changes with a smaller installation, how much housing space does it consume, and does heat recovery itself earn its additional cost? Compare housing only, computing without recovery, and the same building with recovery.

Investigate Warm Tower and change its assumptions →